Requirements and qualifications :
- Minimum 5 years of working experience at Coal Fired Plant in the same position as Turbine Maintenance
- Having experience in lead technician or senior technician role is more preferable
- Having strong knowledge and experience in handling main steam turbine, static equipment, rotating equipment, large capacity generator and others (installation, commissioning, startup, testing, technical repair and troubleshoot)
- Knowledgeable Mechanic drawings, P&ID drawings, as built drawings, engineering data technical information
- Knowledgeable of Safe System Work, PTW, Keselamatan Ketenagakelistrikan, SMK3, or ISO 45001, ISO 14001
- Knowledgeable tin general process of thermal power generation plant
- Knowledgeable with Computerized Maintenance Management System
- Familiar international standard code practices, such as ASME, ASTM, API, JIS, etc
- Experience in unit outage and maintenance overhaul
- Clean track record of 3rd party vendor management
- Bachelor’ degree in mechanical engineering is preferrable
- Experience in large capacity CFPP (above 660 MW) with Super Critical Boiler will be an advantage
- Having skill related certification or license will be an advantage
- Active English communication skill (verbal and written) is a must
- Willing to work in Cirebon