Requirements and qualifications:
- Minimum 3 years of professional experience, with 2 years of experience in CFPP turbine maintenance.
- Having experience in lead technician or senior technician role is more preferrable.
- Having strong knowledge and Experience in handling main steam turbine, static equipment, rotating equipment, large capacity generator and others (installation, commissioning, startup, testing, technical repair and troubleshoot).
- Knowledgeable Mechanical drawings, P&ID drawings, as built drawings, engineering data, technical information.
- Knowledgeable with Preventive, Corrective Maintenance.
- Knowledgeable of Safe System Work, PTW, Keselamatan Ketenagalistrikan, SMK3 or ISO 45001, ISO 14001.
- Knowledgeable in general process of thermal power generation plant.
- Knowledgeable with Computerized Maintenance Management System.
- Familiar international standard code practices, such as ASME, ASTM, API, JIS, etc.
- Experience in unit outage and maintenance overhaul.
- Clean track record of 3rd party vendor management.
- Bachelor’s degree in mechanical engineering is preferrable.
- Experience in large capacity CFPP (above 660 MW) with Super Critical Boiler will be an advantage.
- Having skill related certification or license will be an advantage.
- Active English communication skill (verbal and written) is a must.
- Willing to work in Cirebon.